top of page
Hosdurga Project

KPTCL- 66/11KV Substation, Hosadurga

MR Power Solutions successfully executed key engineering, construction, and power evacuation infrastructure works for the 6.5 MWac / 7.1 MWp Solar Power Plant associated with the 66/11KV KPTCL Substation at Hosadurga. The project was developed to strengthen renewable energy integration into the grid while ensuring efficient and reliable power transmission.

Project Capacity

6.5 MWac / 7.1 MWp

​

Project Location

Pilampura Village

​

Client

MEIL, Hyderabad

​

Category

Solar Power Plant EPC & Power Evacuation Infrastructure

Scope of Work

  • Installation & Commissioning of 6.5 MWac / 7.1 MWp Solar Power Plant

  • Construction of ~8–9 KM Transmission Line

  • Construction of Main Control Room (MCR)

  • Construction of Switchyard within Plant Premises

  • Construction of 11KV Terminal Bay inside KPTCL Premises

  • Testing, Synchronization & Grid Connectivity Works

Solar Power Plant Installation & Commissioning

MR Power Solutions carried out the complete installation and commissioning activities for the utility-scale solar power plant.

  • Installation of solar PV modules and mounting structures

  • AC & DC electrical works

  • Inverter installation and integration

  • Cable laying, routing, and termination

  • Earthing and lightning protection systems

  • Testing, synchronization, and commissioning activities

Transmission Line Construction

MR Power Solutions executed the complete construction of approximately 8–9 KM of transmission line connecting the solar project site to the KPTCL substation.

  • Survey and route alignment

  • Pole/tower erection

  • Conductor stringing and sagging

  • Installation of insulators and hardware fittings

  • Earthing and safety systems

  • Testing and commissioning of the transmission line

Main Control Room (MCR)

A dedicated Main Control Room (MCR) was constructed within the plant premises to support monitoring, protection, and operational management of the solar power plant.

  • Centralized monitoring systems

  • SCADA and control integration support

  • Protection and control panel installation

  • Operator workspace and equipment housing

  • Electrical safety and ventilation provisions

Switchyard & Terminal Bay Infrastructure

MR Power Solutions executed the complete switchyard infrastructure and 11KV terminal bay necessary for reliable power evacuation and grid integration.

  • Structural and civil foundation works

  • Installation of switchyard equipment

  • Protection and control systems integration

  • Cable trench and routing works

  • Testing and commissioning as per utility standards

MR Power Solutions – Expertise Demonstrated

  • Transmission Line Construction

  • Substation & Switchyard Execution

  • Solar Power Plant Grid Connectivity

  • Utility-Compliant Engineering

  • Testing & Commissioning

bottom of page