KPTCL- 66/11KV Substation, Hosadurga
MR Power Solutions successfully executed key engineering, construction, and power evacuation infrastructure works for the 6.5 MWac / 7.1 MWp Solar Power Plant associated with the 66/11KV KPTCL Substation at Hosadurga. The project was developed to strengthen renewable energy integration into the grid while ensuring efficient and reliable power transmission.
Project Capacity
6.5 MWac / 7.1 MWp
Project Location
Pilampura Village
Client
MEIL, Hyderabad
Category
Solar Power Plant EPC & Power Evacuation Infrastructure
Scope of Work
-
Installation & Commissioning of 6.5 MWac / 7.1 MWp Solar Power Plant
-
Construction of ~8–9 KM Transmission Line
-
Construction of Main Control Room (MCR)
-
Construction of Switchyard within Plant Premises
-
Construction of 11KV Terminal Bay inside KPTCL Premises
-
Testing, Synchronization & Grid Connectivity Works
Solar Power Plant Installation & Commissioning
MR Power Solutions carried out the complete installation and commissioning activities for the utility-scale solar power plant.
-
Installation of solar PV modules and mounting structures
-
AC & DC electrical works
-
Inverter installation and integration
-
Cable laying, routing, and termination
-
Earthing and lightning protection systems
-
Testing, synchronization, and commissioning activities
Transmission Line Construction
MR Power Solutions executed the complete construction of approximately 8–9 KM of transmission line connecting the solar project site to the KPTCL substation.
-
Survey and route alignment
-
Pole/tower erection
-
Conductor stringing and sagging
-
Installation of insulators and hardware fittings
-
Earthing and safety systems
-
Testing and commissioning of the transmission line
Main Control Room (MCR)
A dedicated Main Control Room (MCR) was constructed within the plant premises to support monitoring, protection, and operational management of the solar power plant.
-
Centralized monitoring systems
-
SCADA and control integration support
-
Protection and control panel installation
-
Operator workspace and equipment housing
-
Electrical safety and ventilation provisions
Switchyard & Terminal Bay Infrastructure
MR Power Solutions executed the complete switchyard infrastructure and 11KV terminal bay necessary for reliable power evacuation and grid integration.
-
Structural and civil foundation works
-
Installation of switchyard equipment
-
Protection and control systems integration
-
Cable trench and routing works
-
Testing and commissioning as per utility standards
MR Power Solutions – Expertise Demonstrated
-
Transmission Line Construction
-
Substation & Switchyard Execution
-
Solar Power Plant Grid Connectivity
-
Utility-Compliant Engineering
-
Testing & Commissioning