top of page
Terakanambi

KPTCL- 66/11KV Substation, Terakanambi

MR Power Solutions successfully executed critical solar power plant infrastructure works for the 8.177 MWac / 9 MWdc Solar Power Plant connected to the 66/11KV KPTCL Substation at Terakanambi, Mysuru District. The project was undertaken for Mahaveer Electro-Mech Pvt. Ltd. and involved complete execution of both the AC and DC side electrical works along with switchyard infrastructure development.

Project Capacity

8.177 MWac / 9 MWdc Solar Power Plant

​

Project Location

Terakanambi, Mysuru District

​

Client

Mahaveer Electro-Mech Pvt. Ltd.

​

Category

Utility-Scale Solar Power Plant & Switchyard Infrastructure

Scope of Work

  • Complete DC Side Works – Solar Power Plant

  • Complete AC Side Works – Solar Power Plant

  • Switchyard Works

  • Testing & Commissioning Infrastructure

  • Grid Connectivity & Synchronization Works

  • Testing, Synchronization & Grid Connectivity Works

Complete DC Side Works – Solar Power Plant

  • MR Power Solutions carried out the complete DC side installation and integration works required for efficient solar power generation.

  • Installation of solar PV modules

  • Module mounting structure installation

  • DC cabling and interconnection works

  • String combiner box installation

  • Earthing and lightning protection systems

  • Testing and quality inspections

Complete AC Side Works – Solar Power Plant

MR Power Solutions executed the complete AC side electrical infrastructure necessary for transmitting generated solar power to the grid.

  • Inverter installation and commissioning

  • AC cabling and power evacuation systems

  • Transformer integration works

  • HT/LT panel installation

  • Earthing and safety systems

  • Testing and commissioning activities

Switchyard Works

MR Power Solutions also executed the switchyard infrastructure within the project premises to support safe and efficient power evacuation.

  • Civil and structural foundation works

  • Equipment erection and installation

  • Busbar and interconnection systems

  • Earthing and lightning protection systems

  • Integration with transmission and utility systems

Execution Highlights

MR Power Solutions ensured effective project planning, technical supervision, and quality control throughout every phase of execution.

  • Successful execution of complete AC and DC side works for a utility-scale solar power plant

  • High-quality installation practices ensuring long-term plant reliability

  • Efficient coordination between engineering, procurement, and execution teams

  • Strict adherence to safety standards and technical specifications

  • Seamless integration with grid evacuation infrastructure

MR Power Solutions – Expertise Demonstrated

  • Transmission Line Construction

  • Substation & Switchyard Execution

  • Solar Power Plant Grid Connectivity

  • Utility-Compliant Engineering

  • Testing & Commissioning

bottom of page